TXDOT Closures Week of Feb 24

IH10 Riprap Project

Monday, February 24 through Friday, February 28

9am to 4pm

•      IH10 Eastbound CD middle lane between Buena Vista and Executive right lane closure.

•      IH10 Westbound middle lane between Executive and Sunland Park right lane closure.

GO10 Project Utility

Monday, February 24 through Friday, March 6

Continuous

•      Mesa Eastbound (in the direction headed toward the mountain) will be reduced to one lane between Osborn and Remcon.

•      No right turns will be permitted onto Mesa from Westbound CD/IH10 Mesa exit ramp.

IH10 Ramp Improvements – Phase 2

Monday, February 24 through Friday, February 28

9am to 4pm

•      IH10 at Airway turnaround closed in both directions.

•      IH10 at Airway underpass North and Southbound right lane closure.

•      IH10 at Gateway East from Hawkins to Hunter/Viscount alternate lane closures.

•      IH10 at Gateway West from Viscount to Hawkins right lane closure.

•      IH10 at Hawkins Westbound off-ramp closed.

Monday, February 24 through Friday, February 28

9pm to 5am

•      IH10 at Gateway Blvd West from Westmoreland to Airway full closure.

Pothole Repairs

Monday, February 24 through Friday, February 28

9am to 4pm

•      Mesa between Brentwood and Executive, Northbound and Southbound alternating lane closures.

Crack Seal Operations

Monday, February 24 through Thursday, February 27

9pm to 5am

•      LP375 Eastbound and Westbound between Tom Mays Park and IH10 alternating lane and ramp closures.

•      IH10 Desert Northbound and Southbound from Mesa to Enchanted Springs alternating lane closures.

•      IH10 Gateway Blvd East from Eucalyptus to Trowbridge.

•      IH10 Gateway Blvd West from Trowbridge to just past North Virginia alternating lane and ramp closures.

Monday, February 24 through Saturday, February 29

9am to 4pm

•      LP375 Eastbound and Westbound between Tom Mays Park and IH10 alternating lane and ramp closures

•      IH10 Desert Northbound and Southbound from Mesa to Enchanted Springs alternating lane closures.

•      IH10 Gateway Blvd West from Trowbridge to just past North Virginia.

•      IH10 Gateway Blvd East from Eucalyptus to Trowbridge alternating lane and ramp closures.

I-10 Landscape Improvements

Monday, Jan. 13 through Friday, March 20, 2020
9 a.m. to 3 p.m.

  • I-10 alternating eastbound and westbound left and right lane closures between Eastlake Boulevard and Horizon Boulevard.
  • I-10 alternating eastbound and westbound entrance and exit ramps to include turnaround.
  • Closure is necessary for construction of landscape improvements to include excavation, ground cover, modular block planters, concrete and maintenance.

Mall Braided Ramps Project

Sunday, Feb. 23 through Friday, Feb. 28 (complete closure)
9 p.m. to 5 a.m. (overnight)

  • I-10 westbound complete closure between Hawkins Boulevard and Airway Boulevard.
  • Crews will be repairing armored joint.

Monday, Feb. 24 through Friday, Feb. 28
7 a.m. to 4 p.m.

  • Gateway Boulevard eastbound left lane closure at Hawkins Boulevard intersection.
  • Crews will be working on retaining walls.

Monday, Feb. 24, through Thursday, Feb. 27

Nightly, 9 p.m. to 5 a.m.

  • Southbound US 54 will be closed between I-10 and Loop 375.
  • DETOUR: Take Exit 21A (I-10 East/Van Horn), take Exit 23B (US 62/180/Chelsea Street/Paisano Drive), travel south on Paisano to US 54.
  • SH 20 (Alameda Avenue) will be closed to all traffic at US 54.
  • DETOURS: Eastbound traffic will turn left on Loop 478 (Copia Street), right on Gateway Boulevard East, and right on Raynolds street. Westbound traffic will use westbound US 62 (Paisano Drive) and turn right on Loop 478 (Copia Street).
  • NOTE: Alameda will remain open to local traffic only except for the area immediately under US 54.
  • Crews will be working on an overhead bridge deck.

Wednesday, Feb. 26, and Thursday, Feb. 27

Nightly, 9 p.m. to 5 a.m.

  • Ramp N which connects eastbound Loop 375 to northbound US 54 will be closed to all traffic.
  • DETOUR: From eastbound Loop 375, take Exit 59 (US 62/Paisano Drive/Coles Street), then from Paisano take the I-10/US 54/Juárez, México, exit to northbound US 54.
  • Crews will be working on a concrete bridge abutment.

Zaragoza/Montwood Improvement Project

Tuesday, Feb. 25

9 a.m. to 11 a.m.

  • Joe Battle Boulevard northbound right lane closure at Zaragoza intersection
  • Crews will be installing new traffic signals

Sunday, March 08 (complete closure)

5 a.m. to 6 a.m.

  • Joe Battle Boulevard southbound complete closure at Montwood and Zaragoza intersection
  • Crews will be removing existing electric power lines

Links to full lists of closures:

West Area Projects

I-10 Connect

East Area Projects